Warning: file_put_contents(/var/www/html/wp-content/uploads/elementor/css/post-4134.css): Failed to open stream: Permission denied in /var/www/html/wp-content/plugins/elementor/core/files/base.php on line 180

BUSAN CONTAINER TERMINAL

Lift Korea, Lift World

Project Size

The Busan Port New Port Phase 2-4 Private Investment Facility Construction is a large-scale construction that reclaims a site of 630,000㎡ and secures a max water depth of 18m in front of the quay wall. It aims to contribute to the vitalization of the national economy by contributing to securing cargo volume through timely supply of port facilities.

Area
P
Area
m
Qual Wall Length
m
West Revetment
m
Arena Revetment
m
DMC
Dredging
Reclamation
m
Ground improvement
Pavement
Building
Building Area
Building Area
Building total area
Operation Building Area
Operation Building Area
VA
Electricity